Manufacturing
Bills of materials and where production cost hides
Most manufacturers can tell you what materials cost. Far fewer can tell you what a finished unit cost, and the gap is where margin disappears.
Pandoratech·
Multi-level BOMs and the compounding error
When a subassembly feeds another subassembly, an understated cost at the bottom propagates upward. A five percent error on a component becomes a larger error on the finished good, which is why costing has to be built from the structure rather than estimated at the end.
Scrap is a rate, not an accident
Every process has a yield. Treating scrap as an exception means the standard cost assumes perfect conversion, and the variance shows up later as an unexplained gap. Putting a realistic rate in the BOM makes the cost honest and the variance meaningful when it appears.
Overhead that never reaches the product
Machine time, utilities and supervision are real costs of production. If they sit in a monthly expense account, product cost is understated and the least efficient products look the same as the best. Applying overhead through work-centre rates puts it where the decision is made.